Configuration and BOM
Machinery, especially engineered lines, is almost one BOM per order. Design changes while purchasing has already ordered and the floor swaps a gearbox; assembly runs in weeks; five years later service still asks which drawing revision that machine shipped. A standard-parts work-order model will twist. We run a serial as the spine: design BOM, process, purchased parts, assembly records, debug reports, ship pack, later repairs all hang on that machine. A change is not a spoken word—it revises the BOM, evaluates already-bought and WIP, stops what must stop, swaps what must swap, and the trail stays on the serial file.