Production & manufacturing

General manufacturing

The first question in a manufacturing rollout is not which MES to buy—it is where work orders come from, who reports progress, and which step inspection blocks. If the process is unclear, the system just becomes more data entry.

Cluster Manufacturing
Focus Orders · lines
Delivery Gate by gate, acceptable and operable

How we see this industry

Orders and kitting

Manufacturers start talking “pick an MES” and go wrong there. Whether work orders come from sales or planning, when kitting allows start, whether labor is keyed or scanned at the op, whether a fail is rework or scrap—if those stay verbal, go-live only adds another data-entry layer. We walk one work order with planning, warehouse, and the supervisor: issue, start, move, put-away. Which step is a paper card, which is WeChat, which is not recorded at all, goes on the scope list. Clear that chain before deciding what enters the system and what this phase leaves.

Labor and output

Labor and output are the easiest manufacturing numbers to fake and to distort. If operators find the form a delay, numbers are filled after the shift to the standard. We bind labor to the operation: start, complete, a required defect reason, quantity checked against remaining on the order. WIP planning sees and warehouse inbound pending must come from the same order state—not three sheets that never match in a meeting.

In-process inspection

First-article, patrol, and final inspection that live only in a QC notebook let defects keep flowing. Inspection points hang on the operation; a fail cannot move; concession needs approval. Downtime, changeover, and wait-for-material need a place to be recorded or OEE is a guessed number. Material-side kitting: starting short a critical part means the line will stop later waiting.

Lost time

Changeover, tooling, wait-for-material, and breakdowns that never enter the system leave planning on an ideal takt. Supervisors get a short exception path; reason codes are short and selectable, not an essay. Rework orders spawn from the original so consumption and hours stay separate, or rework cost disappears inside good-product orders. Piece-rate tied to labor must be nailed before build or operators will fill whatever pays them.

A representative line

Go-live usually picks a representative line, runs real work orders for a week, then expands. Connect existing ERP items and orders instead of inventing another part-number set. Training is supervisors and warehouse, not a video-wall demo for IT. A manufacturing system that works lets planning see WIP, quality see which op failed, and the warehouse issue by order—three books become one.

Typical scenarios

Work orders and scheduling

Orders become work orders, scheduled against capacity and kit availability, with rules for insertions instead of shouting.

Shop-floor reporting

Stations scan to report, good and defective counts are recorded separately, and hours and output roll up automatically.

Equipment and lines

Machine status, utilisation, and downtime reasons are collected, and abnormal stops have an owner.

Common blockers and how we handle them

Blocker

Planning lives in spreadsheets and the floor runs on paper, always a day apart

How we handle it

Work orders flow through the system, scans update them on the spot, and planners see the actual floor state.

Blocker

Defect reasons are written every which way, so improvement has no direction

How we handle it

Reasons become fixed options plus notes, counted by operation and cause, and the top three get worked first.

Blocker

Work-in-progress quantities are unreliable and kit shortages are invisible

How we handle it

WIP is recorded per operation, and a kit check runs automatically before scheduling.

Common system modules

BOM and routing

Versioned BOMs, operations, standard times.

Work orders and scheduling

Release, scheduling, insertions, kit checks.

Shop-floor reporting

Scan reporting, good and defective counts, hours.

Quality and inspection

Incoming, in-process, and final inspection, defect analysis.

Equipment and utilisation

Machine status, utilisation, downtime reasons.

Stock and issues

Raw, WIP, and finished stock with issues and returns.

Delivery gates

  1. Scope

    Walk one work order through issue, start, move, and put-away. Split which labor and inspection must enter the system and which stay paper this phase.

  2. Architecture

    Fix work-order state, kitting rules, and defect handling. Confirm ERP item and order connections so a second code set is not invented.

  3. Build & integrate

    Connect labor and moves on a real line. Fail-cannot-move and quantity vs remaining on the order are acceptance items written first.

  4. Launch & operate

    Run the pilot line a week, then expand. Train supervisors and warehouse; WIP and pending inbound follow order state. Iterate next on equipment lost time.

Related capabilities

Related industries

Industries we ship in

Walk us through your process before anything gets built

Tell us how the work happens today, where it breaks, and when you need it live. We will come back with a scope you can check and a phasing plan.

Contact Us

Email
service@wehoope.com
Phone
+86 139-2520-6166
Address
W903, Shenzhen-Hong Kong Industry-Education-Research Base, 201 Gaoxin South 7th Road, Nanshan District, Shenzhen