SimtoLink

January 2026

SimtoLink updates published in January 2026.

Back to SimtoLink

SimtoLink

SimtoLink: Site dust monitors upload particle readings on a schedule

January 24, 2026

A power-quality monitoring terminal (PQM/PQD) records indicators such as voltage swells and sags, harmonics, three-phase unbalance, and flic…

SimtoLink

SimtoLink: Sluice controllers report opening and alarms

January 16, 2026

A microgrid controller, or energy management system (EMS), coordinates distributed generation, storage, and loads. In grid-tied mode it take…

SimtoLink

SimtoLink: Livestock tags report location and activity

January 5, 2026

An electronic ear tag is an individual livestock identifier based on RFID or a QR code. It gives each cow, sheep, pig, and similar animal a…